The Edge at Sunset
Hot-applied rubberized asphalt over the podium slab, the planters and the drains, with reinforced flashing at every wall, and a coating on the planter caps.

- Location
- South Florida
- Scope
- Hot-applied waterproofing at the podium deck and planters
- Typical layers
- 01Structural slab
- 02Primer
- 03Hot-applied rubberized asphalt, reinforced
- 04Protection course
- 05Drainage composite
- 06Pavers, soil or topping slab
Photos from the job
Before: bare concrete at the podium and planters, in the rain.
Hot-applied membrane across the deck, with the flashing run up the parapet.
Reinforcing fabric at the walls and the deck drain flashed in.
Planter box membrane, flashed at the corners, the drain and the conduits.
Flashing detail at the parapet and the deck drain.
Coating at the planter caps.