Invite us to bidGet a bid

Clematis

Below-grade membrane at the elevator pits, installed before the pour.

Sheet membrane installed in the elevator pit excavation at the Clematis project
Location
West Palm Beach, Florida
Scope
Elevator pit waterproofing
System
Below-grade waterproofing
Typical layers
  1. 01Concrete substrate
  2. 02Primer
  3. 03Sheet-applied membrane
  4. 04Protection or drainage board
  5. 05Backfill
Invite us to bid
Next projectNatiivo Miami